Skip to content
SolarBachat

Rooftop solar in Tamil Nadu

The short answer

A 3 kW system in Tamil Nadu costs about ₹1,74,000 before subsidy and ₹96,000 after the ₹78,000 PM Surya Ghar subsidy. Against TANGEDCO’s average of ₹5.2/unit, it saves around ₹1,841 a month and breaks even in roughly 4.3 years.

avg tariff, ₹/unit
₹5.2
avg tariff, ₹/unit
units per kW monthly
118
units per kW monthly
max central subsidy
₹78,000
max central subsidy

System prices in Tamil Nadu, after subsidy

At the live ₹58,000/kW benchmark. Your signed quote should be within about 15% of these figures — ask for the difference line by line.

SystemBefore subsidySubsidyNet costSaves/monthPayback
1 kW₹58,000₹30,000₹28,000₹6144 yrs
2 kW₹1,16,000₹60,000₹56,000₹1,2274 yrs
3 kW₹1,74,000₹78,000₹96,000₹1,8414 yrs
5 kW₹2,90,000₹78,000₹2,12,000₹3,0686 yrs
10 kW₹5,80,000₹78,000₹5,02,000₹6,1367 yrs

Savings assume the system offsets your consumption via TANGEDCO net metering.

Tamil Nadu solar FAQ

What is the solar subsidy in Tamil Nadu?

Tamil Nadu homes get the central PM Surya Ghar subsidy: ₹30,000/kW up to 2 kW, capped at ₹78,000 for 3 kW and larger systems. It is credited to your bank account after TANGEDCO commissions the system — not adjusted by the installer.

How many units does 1 kW generate in Tamil Nadu?

About 118 units a month — roughly 3.9 units a day — varying with season, orientation and shading.

Which DISCOM handles rooftop solar in Tamil Nadu?

TANGEDCO processes the net-metering application, the feasibility check and the bidirectional meter for residential systems.

Is rooftop solar worth it in Tamil Nadu?

At ₹5.2/unit and 118 units per kW monthly, households with bills above ₹2,000–3,000 usually break even in 3–5 years — then draw near-free power for the remaining 20-plus years of panel life.